Projects & partners

Programmes, not logos.

Several hundred units delivered worldwide. Here are selected programmes described by the duty, the integration work and what the engineering required.

Selected work

Concrete duties, individual interfaces.

In production

Dual-core CPT 95

A target mass flow of about 2.7 kg/s put the duty in dual-core CPT 95 territory. Packaging analysis identified that an off-centre turbine exhaust could create a vortex in the central casing, so the interface incorporated a diffuser to decelerate the hot gas before expansion.

In engineering

TR2000 recuperator, 20 kW

A custom recuperator for TurboGen’s TR2000, with mounting and casing geometry developed around the programme interfaces. A separate CPT 55 programme is active for the same customer.

Delivered

MTG12 / MTP40 platform

More than ten recuperator units were ordered for Bladon’s MTG12 and MTP40 platform. The work called for a compact core suited to the package and its repeated thermal duty.

Custom engineering

Heat recovery beyond standard products

Documented work includes biomass drying from diesel-engine exhaust, steam-generation tests with a GAP-type exchanger, a bypass system built into a recuperator and casing redesign to correct gas-flow distribution.

Start with the conditions

Send the exhaust conditions.

Mass flow, gas temperature, allowable pressure drop and the envelope you have are the useful start to an engineering conversation.

Contact ACTE